Skip to content
SheetB-02
Phase02 Design + 03 Permit
SubjectPermitting & Design
IssueRev. 01

Drawings and approvals

Clear plans. Fast approvals. No handoffs.

Architecture, visualization, planning and permitting sit inside the firm. The people who draw it are the people who get it approved and the people who build it. Nothing is thrown over a wall.

Brass shower fixture in the foreground, oak vanity beyond, shot through the shower glass on a completed project.
01Scope
Architecture and visualization
Concepts developed into buildable drawings, with renderings good enough to decide from.
Permit strategy
Submittals prepared to be approved the first time, not corrected into approval.
Red tag correction
A stopped job is a scheduling emergency. We take over stalled and cited permits and clear them.
Planning and management
One drawing set carried from concept through inspection.

Red tag correction

Your job is stopped. That is a daily cost.

A red tag is not a paperwork problem. Trades are scheduled, materials are on site, and the loan is accruing. Every day the correction sits in someone’s inbox is a day the project pays for nothing.

We take over stalled and cited permits, including jobs we did not draw and did not build. Correction set prepared, resubmitted, and carried through to release.

Get a stalled job moving
Jobs we did not drawAccepted
Jobs we did not buildAccepted
Carried toRelease
MarketsAZ and BCS
01aWhy it sits inside the firm

The people who draw it are the people who get it approved.

When architecture, permitting and construction are three separate companies, every disagreement between them becomes the owner’s problem and the owner’s delay. The drawing gets approved but cannot be built. The build deviates and the inspection fails. Nobody is wrong and nothing moves.

Holding all three removes the negotiation. There is one drawing set, one schedule, and one name on the outcome.

02Record
In houseArchitecture, visualization, planning, permitting
MarketsArizona and Baja California Sur
SpecialtyRed tag correction and stalled permit recovery
Handoffs between firmsNone
Accountable, USAUtham Varma
Accountable, MexicoPaco Heredia
03Accountable

Utham Varma

Lead Architect & Visualization, USA

Leads architectural design and visualization on United States projects, developing concepts into buildable representations.

Paco Heredia

Lead Architect & Visualization, Mexico

Leads architectural design across Mexico, from first concept through planning.

04Next

Start a project.

One form. It routes to the person who owns this phase, notifies them on their phone, and acknowledges you immediately. No portal, no queue, no third party inbox.

Start a project

New drawings, a permit strategy, or a stalled job that needs clearing.

Routed to the design team